Pipe & Pit Installation

Balranald Shire: Potable Water Infrastructure Upgrade

Scope of Works

As part of Balranald Shire’s vital potable water infrastructure upgrades, the shire has engaged contractors to carry out a full refurbishment of the steel water tank.

While the tank is offline, Spot On Civil has been awarded critical works to replace the inlet valve and a section of ductile iron pipe.

Scope of Works Includes:

  • Hydro excavation and potholing to locate existing infrastructure
  • Planning of works and procurement of materials
  • Future planning, including extension and relocation of assets to accommodate upcoming works
  • Coordinating a full town water shutdown (approx. 4 hours)
  • Excavation and removal of existing assets
  • Installation of new valves and replacement piping
  • Installation of appropriate thrust supports for all valves, bends, and tees
  • Backfilling and site compaction in line with site requirements
  • Final site reinstatement

Other Projects

Pipe & Pit Installation

LMW Workshop: Stormwater Drain Installation

Pipe & Pit Installation

Swan Hill Rural City Council: Art Gallery Redevelopment